# Set the default email footer

Every email needs the sender's legal details in its footer. Save them once as the project's default footer, and new emails you create in the Drag & drop editor start with it.

You need the **Domain and email verification** [permission](/product/account-management-and-security/multi-login-accounts/#available-permissions) to open the email platform settings.

To set the default email footer:

1. Go to **Settings** → **Configure platforms** and click **Platform settings** in the **Emails** row. If email isn't set up in this project yet, click **Connect**: the footer card is on the setup page too.
2. On the **Email footer** card, enter the **Company name**. It's required.
3. Enter the **Address**. It's required. If you enter it on several lines, the footer shows it on one line, with the lines separated by commas.
4. Optionally, add the **Privacy policy link**, **Terms link**, and **Contact link**. Each link must start with `https://`, `http://`, or `mailto:`.

   <img src="/start-with-your-project-email-footer-1.webp" alt="Email footer card with company name, address, and privacy policy, terms, and contact links filled in, and the Save button"/>

5. Click **Save**.

## What the saved footer shows

* The company name.
* The address on one line.
* A copyright line: © and the current year followed by the company name.
* The links you added, labeled **Privacy Policy**, **Terms**, and **Contact us**.

New emails you create in the Drag & drop editor get this footer automatically, unless they already have a footer of their own, for example from the template you started with. Emails created before you saved the footer keep their own. To switch one to the project footer, click [**Load from project**](/product/content/email-content/drag-and-drop-email-editor/configure-email-styling-and-footer/#load-or-save-a-project-footer) in its footer settings.

The card and the editor share one project footer. Clicking **Save as project default** in the editor updates the card, and saving the card updates what **Load from project** loads in the editor.

## Change the footer links

When the project footer already has links, the card lists them under **Links in the footer now**, and the link fields stay empty.

* To keep the current links, leave the link fields empty and click **Save**.
* To replace them, fill in the links you want and click **Save**. The footer then carries only the links you entered, so fill in every link you want to keep.